AEG Electrolux EFT 520 Operations Instructions

Browse online or download Operations Instructions for Surge protectors AEG Electrolux EFT 520. AEG Electrolux EFT 520 Operating instructions User Manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - 125 kVA/250 kVA

1OPERATING INSTRUCTIONSENInstructions for Transport Storage Installation CommissioningOperation MaintenanceThyrobox VR 125 kVA/250 kVA

Page 2 - COPYRIGHT

104.2 SAFETY INSTRUCTIONS4.2.1 ACCIDENT PREVENTION REGULATIONSPlease unconditionally observe the accident prevention regulations of your country and t

Page 3

11Only AEG PS original spare parts or original spare parts purchased from AEG PS may be used for maintenance or repair. Personnel must always wear saf

Page 4 - 2. INTENDED USAGE

12Refrain from any kind of working behavior, which impacts the safety of persons and the function of the device in any form.Operate the device only in

Page 5

13The Thyrovox VR was fixed to a transport pallet with four screws at the factory ready for transport and packaged in foil to protect against moisture

Page 6 - 2.2 LOSS OF WARRANTY

14PROCEDURE FOR TRANSPORT WITH THE CRANE/HOIST:• Open the cabinet doors of the Thyrobox VR.• After releasing two‚ concealed front mounted screws (Fig

Page 7 - 3. CONTENT

15The devices in original packaging may be stored in dry, aerated rooms with a solid protective roof for a maximum of six months.• permissible storage

Page 8 - 3.2 ABBREVIATIONS

169.1 GENERAL DESCRIPTIONThe Thyrobox VR is a component which can be used as a voltage regulator at the feed point when feeding renewable energies (e.

Page 9 - 4. SAFETY

179.3 Thyrobox VR ILLUSTRATIONSBelow are depictions of several of the components to make things clearer. The components depicted are examples and may,

Page 10 - 4.2.2 GENERAL SAFETY NOTES

18FIG. 5 LIGHTNING CURRENT AND SURGE ARRESTERFIG. 6 AUTOMATIC CIRCUIT BREAKERS F3-F6 FOR CONTROL VOLTAGEFIG. 7 CONTROL DEVICES THYRO-P A11, A21, A3

Page 11 - 4.2.5 QUALIFIED PERSONNEL

19FIG. 8 FRONT FAN IN SWITCH CABINET DOORFIG. 9 TEMPERATURE MONITORING OF THE Thyrobox VR WITH PT1000FIG. 10 CONCEALED FRONT MOUNTED SCREWS

Page 12 - 5. SCOPE OF SUPPLY

2TECHNICAL QUERIESIf you have any technical queries regarding the subjects dealt with in these operating instructions, please get in touch with our te

Page 13 - 6. TRANSPORT

20FIG. 11 RELAY K49.4 GENERAL (PURPOSE)Voltage regulation in local networks – also see Chapter 1: General Description9.5 ON SITE POWER SUPPLY OF THE

Page 14

2110.1 SAFETY NOTESBefore starting any work on the system the 5 safety rules must be adhered to (see also Chapter on Safety instructions).• If requir

Page 15 - 7. STORAGE

22FIG. 12 BLOCK DIAGRAM Thyrobox VR AND CABLE DISTRIBUTION CABINETCable distribution cabinetPEN bus barPV system4-pole cable4-pole cableground connec

Page 16 - 9. FUNCTIONAL DESCRIPTION

23FIG. 13 CABLE CONNECTING TERMINALS IN THE THYROBOX VR 125 KVA

Page 17 - 9.3 Thyrobox VR ILLUSTRATIONS

24FIG. 14 CABLE CONNECTING TERMINALS IN THE THYROBOX VR 250 KVA

Page 18

25Following the technically correct installation of the Thyrobox VR commissioning takes place.The following steps apply for commissioning and initial

Page 19

26With this configuration (initial situation) the 6 following switch actions are now to be carried out in the sequence indicated:1. Switch on Q1 Thyro

Page 20

27After commissioning or switching on the Thyrobox VR does not require any further operational handling.NOTEIf required the setpoint for the voltage t

Page 21 - 10. ELECTRICAL INSTALLATION

28The start window of theThyro-Tool software appears: 4. Under the menu entry extras transmission parameters, select the serial COM interface

Page 22 - Cable distribution cabinet

297. After inputting the controller address and pressing “OK“ the actual value view opens. In the actual value view the current actual values of each

Page 23

3OBLIGATORY INSTRUCTIONThe operating instructions contain important information on the avoidance of hazards and assist you in installing and operating

Page 24

30The new setpoint is now displayed in the Motorpoti field. The output voltage of the Thyrobox VR is displayed in the field “Voltage Load U_L1“. Here yo

Page 25 - 11. COMMISSIONING

31If the Thyrobox VR is only to be temporarily shut down then the following steps are necessary for decommissioning. The decommissioning of the Thyrob

Page 26

32NOTEThe prerequisite for the disassembly of the Thyrobox VR is that all steps of the decommissioning have initially been carried out.Following this

Page 27 - 12. OPERATION

33To ensure the highest level of operational safety both in terms of protecting personnel and equip-ment, regular monitoring, maintenance and repair w

Page 28

34MATERIAL NO. DESIGNATION ACRONYM0018467 Fuse load switch 3-pole NH00 160A F10018478Grip protection top/ bottom 3-pole NH00for fuse load switchF18000

Page 29

3516. TECHNICAL DATAWEIGHTThyrobox VR, circaConcrete pedestal, circaTotal weight385 kg260 kg645 kgTYPE Thyrobox VR 125 kVA Thyrobox VR 250 kVAThyrobox

Page 30

36Measurements- width- height- depth 1250 mm1355 mm (cabinet without concrete pedestal)1000 mm (total height con-crete pedestal), of which700 mm in th

Page 31 - 13. DECOMMISSIONING

3717. ERROR DIAGNOSESOPERATING STATUS ERROR STATUS POSSIBLE CAUSE OF ERRORLED ON Control deviceLED ON lit LED ON not litF3, F4, F5F1Check mains volta

Page 32 - 14. DISASSEMBLY

38AEG Power Solutions GmbHEmil-Siepmann-Str. 3259581 Warstein-Belecke - GermanyPhone: +49 (0) 2902 763-520/-290 - Fax: +49 (0) 2902 763-1201www.aegpow

Page 33 - 15. MAINTENANCE

4• The Thyrobox VR is a component whose intended usage is as a voltage regulator at the feed point when feeding renewable energies (e.g. photovoltaic

Page 34

5CONNECTIONBefore connection of the Thyrobox VR, the indicated voltage on the type plate is to be compared with the mains voltage to make sure they ma

Page 35 - 16. TECHNICAL DATA

62.2 LOSS OF WARRANTYOur supplies and services are subject to the general conditions of supply for products of the electrical industry, as well as our

Page 36

71. Notes on these operating instructions 32. Intended usage 4 2.1 Non-liability 5 2.2 Loss of warranty 63. Content 7 3.1 List of

Page 37 - 17. ERROR DIAGNOSES

814. Disassembly 32 14.1 Disassembly in detail 3215. Maintenance 33 15.1 Maintenance plan 33 15.2 Maintenance activities 33 1

Page 38 - EN, 06/13 - V1

94.1 DEPLOYED SYMBOLSThe following warning, prohibition, command and notice symbols are deployed in these operating instructions, around and within th

Comments to this Manuals

No comments